Construction of a new deepwater terminal at Kuantan Port on the east coast of Peninsular Malaysia will kick off at the end of this year.

Once completed in two or three years’ time, the MYR3 billion (US$943 million) project will double the port’s capacity to 52 million freight weight tonnes (FWT) per year, elevating it into a mega port from its current feeder port status.

The expansion includes the construction of a new wharf, procurement of equipment, and dredging.

According to port owner IJM Corp Bhd, the first phase of the development is expected to cost MYR2 billion.

The expansion is being undertaken to attract big container and bulk ships to call at the port as well as to enlarge its capacity before it reaches its maximum handling limit in the next few years.

The development of Kuantan Port is part of the country’s east coast economic region master plan, whereby the port will be transformed into an integrated industrial and logistics hub for the region.

The Kuantan industrial blueprint calls for the building of an integrated bio-park, a bio-fuel industrial cluster, a downstream petrochemical cluster, iron and steel industries, and an automotive cluster.

You May Also Like

Mindanao container terminal seen hitting 2012 volume target

Mindanao Container Terminal (MCT) expects to meet its 2012 target volume despite problems that hit the Mindanao region. Located in Tagoloan, Misamis Oriental, southern…

Asia on course for 5.7% GDP growth in 2016 and 2017, says ADB

Developing Asia is expected to grow steadily despite external pressures and should meet earlier forecasts for 2016 and 2017, aided by resilience in the…

Shippers join forces to monitor mega-ship alliances

International shippers from Europe, Asia, and the United States have teamed up to ensure that free trade is not compromised, especially with the move…