ATI_BatangasPort-300x183CARGO handling fees for empty containers at the Batangas Container Terminal (BCT) do not include charges for arrastre services, the Philippine Ports Authority (PPA) clarified.

“The existing schedule of cargo handling rates for import and export cargoes passing through the BCT does not contain any rate for arrastre services on empty containers,” according to PPA Memorandum Circular 12-2013 that PPA general manager Juan Sta.Ana signed on Dec. 11.

For a copy of PPA MC 12-2013, go to http://www.scribd.com/doc/195760418/PPA-Memorandum-Circular-12-2013.

The memorandum was issued to “avert possible confusion as regards the assessment on empty containers” that pass through BCT.

“No arrastre fees, therefore, shall be charged on empty containers, whether these are considered part of vessels gears or as export or import cargoes,” the memorandum clarified.

Stevedoring fees, on the other hand, are charged for such handling services as contained in the schedule of cargo handling tariff at BCT.

All cargo and vessel charges are reflected in the BCT tariff.

The BCT is part of the Port of Batangas and operated and managed by Asian Terminals Inc.

Photo courtesy of Asian Terminals Inc.

You May Also Like

Maersk mega boxship sets world load record

Maersk Line’s ultra-large container vessel Mumbai Maersk has set a world record for highest ever load, surpassing the mythical 19,000 twenty-foot equivalent unit (TEU)…

Thai Customs to adopt logistics blockchain technology TradeLens

The Customs Department of Thailand will use the logistics blockchain platform TradeLens jointly developed by IBM and Maersk to streamline procedures and to track…

Uniform rates for MM traffic offenses soon in effect

National government agencies and Metro Manila mayors have agreed to come up with a unified ticketing system and impose standard fines for motorists who…

PPA approves 11% hike in cargo handling rates at Batangas port

The Philippine Ports Authority (PPA) has approved an 11% increase in cargo-handling rates at Batangas Port Phase 1, to take effect on May 28.…