THE Department of Public Works and Highways is fast tracking the completion of roads and bridges under a P9.7-billion grant from the Japan Bank of International Cooperation (JBIC).

Package 1 is for completion by December 2009 and Package 3 by September. The projects involve the construction of 17 and 64 bridges, respectively.

Bridges for construction under Package 1 include the 535-meter (m)-long Amburayan bridge in Ilocos Norte, 456m Quirino bridge in Ilocos Sur and La Union, the 520 m Sarat bridge in Ilocos Norte, and 66.5m reversed arch steel-type Kaling bridge in Benguet.

The remaining 13 short span bridges are scattered in Region 1 and the Cordillera Autonomous Region (CAR). The project is 21.03% complete.

To date, the DPWH has completed 32 bridges under Packages 1 and 3-six in Alabat Island in Quezon province, six in Mindoro Occidental, 13 in Mindoro Oriental, three in Batangas, three in Cavite and one in Bicol.

Package 2 covers Regions 2 and 3 as well as CAR and involves 29 bridges.

Package 4 is concentrated in Visayas and Mindanao. The projects are up for bidding this month.

You May Also Like

APEC leaders unveil plan to create competitive roadmap for services sector

Asia-Pacific Economic Cooperation (APEC) leaders have agreed to develop starting next year a long-term roadmap to boost the competitiveness of the services sector in…

NOL whittles net loss to $419M for 2012

Singapore-based Neptune Orient Lines (NOL) recorded a full-year net loss of US$419 million in 2012, a 12 percent improvement over the net loss of…

Cold chain operator gets tax breaks for P296M expansion plan

COLD chain operator METS Logistics Inc’s P296.2-million expansion plan recently received Board of Investments pioneer status. Expected to be completed in January 2012, the…

Key logistics market growth slowed in 2018 amid mounting downward pressure—Ti

Global logistics market growth rates fell in 2018 due to rising economic challenges and the strong performance of the industry in 2017, according to…