THE Phividec Industrial Authority will re-bid the operation and management of Mindanao Container Terminal Port (MCTP) in Misamis Oriental as the initial exercise only had one qualified bidder – Asian Terminals, Inc. (ATI).

The contract involves management and operation of the MCTP for a period of 20 to 25 years.

The P4.4-billion Mindanao Container Terminal Project will handle both international and domestic volume. The terminal will have an annual capacity of 270,000 TEUs and a draft of 12 meters to accommodate post-panamax vessels.

You May Also Like

PH Coast Guard takes over nationwide seaports security

Philippine Transportation Secretary Arthur Tugade ordered the Philippine Coast Guard (PCG) to take over control and supervision of security operations in all seaports nationwide…

P2.7B container terminal to rise in Davao del Norte

The Philippine-based Anflocor Group of Companies will sink in P2.7 billion to build a container terminal in Panabo City in Davao del Norte, in…

Palace asked to rule on Subic Naval Supply Depot award

The Subic Bay Metropolitan Authority (SBMA) has asked the Philippine Office of the President (OP) to rule on whether the Naval Supply Depot (NSD)…

ICTSI gets P7B loan

INTERNATIONAL Container Terminal Services, Inc (ICTSI) has secured a P7-billion loan to finance different port projects worldwide. The credit facility will also be used…