Container shipping line APL said its on-time performance in the trans-Pacific trade was 94 percent for the first half of 2011.

In its midyear report on 2011 vessel reliability, the Singapore-based carrier said that APL ships missed their arrival window only seven times out of 114 port calls to the U.S. West Coast from January to June 2011.

APL attributed the delays to unseasonal typhoons, heavy fog and the earthquake in Japan.

The report measures reliability on the five Asia-to-U.S. West Coast services operated exclusively by APL vessels. The trans-Pacific is watched closely as a barometer of global trade since it connects North American consumer markets with Asian manufacturing centers.

APL’s report comes just as the traditional peak-season is set to begin in the trade.

APL considers vessels on time if they arrive within four hours of their scheduled arrival. Most carriers measure reliability on arrival windows that range from 12 to 24 hours, it said.

You May Also Like

Petron cancels contract with Herma Shipping

PETRON CORP. has cancelled its multimillion oil cargo-handling contract with Herma Shipping and Transport Corp. due to alleged syndicated oil theft at sea worth…

Head honchos of Hanjin, Cosco resign

Young Min Kim, president and CEO of Hanjin Shipping, has stepped down, taking responsibility for the continuing company losses and delays in acquiring financial…

CMA CGM chalks up Q3 profit, revenue

France’s CMA CGM announced a net profit of US$371 million in the third quarter of the year, which it attributed to a highly successful…

NOL reports $478 million loss in 2011

Singapore-based Neptune Orient Lines (NOL) announced a net loss of US$478 million in 2011, a big turnaround following net earnings of $461 million in 2010.…